Experience: Infrastructure and transport Description: The proposed development comprises an east access road, approximately 2,200m long, into the Edinburgh Airport campus, from the Gogar roundabout on the A8 Location: Edinburgh Airport, Edinburgh Total Construction Value: £10M Client: Curtins Consulting Limited Ultimately Client: Edinburgh Airport Limited Project role: drainage and flood risk engineer Scope: Flood Risk assessment, Surface Water Management Plan, SuDS and Surface Water detailed design, EIA Water Environment chapter.